Bi, L, Ren, B, Zhong, D and Hu, L (2015) Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process. Journal of Construction Engineering and Management, 141(02).

Boz, M A and El-adaway, I H (2015) Creating a Holistic Systems Framework for Sustainability Assessment of Civil Infrastructure Projects. Journal of Construction Engineering and Management, 141(02).

Kaminsky, J and Javernick-Will, A (2015) Theorizing the Internal Social Sustainability of Sanitation Organizations. Journal of Construction Engineering and Management, 141(02).

Kashani, H, Ashuri, B, Shahandashti, S M and Lu, J (2015) Investment Valuation Model for Renewable Energy Systems in Buildings. Journal of Construction Engineering and Management, 141(02).

Lee, S (2015) Determination of Priority Weights under Multiattribute Decision-Making Situations: AHP versus Fuzzy AHP. Journal of Construction Engineering and Management, 141(02).

  • Type: Journal Article
  • Keywords: Fuzzy sets; Decision making; Risk management; Construction management; Analytic hierarchy process (AHP); Fuzzy AHP; Decision-making; Risk management; Performance evaluation; Quantitative methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000897
  • Abstract:
    The analytic hierarchy process (AHP) approach has been widely applied in multiattribute decision-making situations since being introduced in 1980. It has been believed that the AHP is appropriate to assist decision-making problems characterized by a number of interrelated factors. Recently, a derivative of the AHP, the so-called fuzzy AHP, has been developed by mixing AHP with a fuzzy set theory. This new method increasingly extends its application areas in construction management. Despite extensive use of the fuzzy AHP, little research has been conducted as to the comparability of calculated priority weight vectors by the fuzzy AHP with those by the traditional AHP. Therefore, this paper mainly focuses on the comparison of two AHP approaches by investigating weight vectors produced from a real case study. From the previous studies, four different fuzzy AHP approaches are prepared by applying different fuzzy fundamental scales and weight aggregations, and are tested to identify which method produces the most comparable results with the traditional AHP. The main findings and results obtained from the four approaches are presented and discussed in detail.

Lei, Z, Han, S, Bouferguène, A, Taghaddos, H, Hermann, U and Al-Hussein, M (2015) Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants. Journal of Construction Engineering and Management, 141(02).

Leung, M, Bowen, P, Liang, Q and Famakin, I (2015) Development of a Job-Stress Model for Construction Professionals in South Africa and Hong Kong. Journal of Construction Engineering and Management, 141(02).

Li, H, Xu, Z and Demeulemeester, E (2015) Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering and Management, 141(02).

Liao, C (2015) Optimal Inspection Strategies for Labor Inspection in the Construction Industry. Journal of Construction Engineering and Management, 141(02).

Lu, W, Zhang, L and Li, Z (2015) Influence of Negotiation Risk Attitude and Power on Behaviors and Outcomes When Negotiating Construction Claims. Journal of Construction Engineering and Management, 141(02).

Mostafa, M A and El-Gohary, N M (2015) Semantic System for Stakeholder-Conscious Infrastructure Project Planning and Design. Journal of Construction Engineering and Management, 141(02).

Russell, M M, Liu, M, Howell, G and Hsiang, S M (2015) Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System. Journal of Construction Engineering and Management, 141(02).

Sun, Y and Zhang, L (2015) Balancing Public and Private Stakeholder Interests in BOT Concessions: Minimum Revenue Guarantee and Royalty Scheme Applied to a Water Treatment Project in China. Journal of Construction Engineering and Management, 141(02).